Performance Requirement · NCC 2025 Volume Three
C1P1 Disposal
Part C1 Sanitary plumbing systems · NCC 2019: CP1.1
Sewage and sullage must be conveyed through a sanitary plumbing system to—
a sanitary drainage system; or
an approved disposal system authorised by an authority having jurisdiction.
Changed since NCC 2022. See NCC 2022 Volume Three C1P1, or show what changed.
A Sewage and sullage must be conveyed through a sanitary plumbing system must ensure sewage or sullage is transferred to — a sanitary drainage system system; or an approved disposal system. system authorised by an authority having jurisdiction.
Removed words are struck through; added words are highlighted. Comparison of the text only.