NSW B5D8 Cooling tower water service
NSW Part B5 Cross-connection control
Insert NSW clause B5D8 in clause B5D8 as follows:
Water systems permanently attached to cooling towers backflow prevention shall be positioned so that—
cooling tower air gap must be measured from the rim of the cooling tower basin; and
if a drinking water service to the cooling tower passes through the basin, the service pipe must be provided with a double wall protection; and
if a fast fill connection is required, the fast fill line shall terminate externally to the unit, with an air gap over either the basin or a tundish.
Notes
See NSW Figure B5D8 for typical cooling tower connections.
Insert NSW figure (B5D8) B5D8 as follows:
NSW Figure B5D8: Typical cooling tower service
Figure Notes
Note 1.
Refer to AS/NZS 3500.1 Part 1 Table 4.6.3.2