New South Wales variation · NCC 2025 Volume Three

NSW B5D8 Cooling tower water service

NSW Part B5 Cross-connection control

Open on NCC Online ↗

Insert NSW clause B5D8 in clause B5D8 as follows:

Water systems permanently attached to cooling towers backflow prevention shall be positioned so that—

cooling tower air gap must be measured from the rim of the cooling tower basin; and

if a drinking water service to the cooling tower passes through the basin, the service pipe must be provided with a double wall protection; and

if a fast fill connection is required, the fast fill line shall terminate externally to the unit, with an air gap over either the basin or a tundish.

Notes

See NSW Figure B5D8 for typical cooling tower connections.

Insert NSW figure (B5D8) B5D8 as follows:

NSW Figure B5D8: Typical cooling tower service

Figure Notes

Note 1.

Refer to AS/NZS 3500.1 Part 1 Table 4.6.3.2

New in NCC 2025. No NSW B5D8 in NCC 2022 Volume Three; it may have moved or been renumbered.