Performance Requirement · NCC 2025 Volume Two

H1P2 Buildings in flood areas

Part H1 Structure · NCC 2019: P2.1.2

Open H1P2 on NCC Online ↗
Varied in QLD, SA. Check the variation for your state.

(1) A building in a flood hazard area must be designed and constructed, to the degree necessary, to resist flotation, collapse or significant permanent movement resulting from the action of hydrostatic, hydrodynamic, erosion and scour, wind and other actions during the defined flood event.

(2) The actions and requirements to be considered to satisfy (1) include but are not limited to—

flood actions; and

elevation requirements; and

foundation and footing requirements; and

requirements for enclosures below the flood hazard level; and

requirements for structural connections; and

material requirements; and

requirements for utilities; and

requirements for occupant egress.

Limitations

H1P2 only applies to a Class 1 building.

Same wording in NCC 2022 Volume Two. See NCC 2022 Volume Two H1P2.

State and territory variations all clauses side by side →