Deemed-to-Satisfy Provision · NCC 2025 Volume Two
H6D1 Deemed-to-Satisfy Provisions
Varied in NT. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements H6P1 and H6P2 are satisfied by complying with H6D2.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Same wording in NCC 2022 Volume Two. See NCC 2022 Volume Two H6D1.
State and territory variations all clauses side by side →
Clauses referred to
- H6P1 Thermal performance
- H6P2 Energy usage
- H6D2 Application of Part H6
- A2G2 Performance Solution
- A2G4 A combination of solutions