New South Wales variation · NCC 2025 Volume Two

NSW H1P1 Structural reliability and resistance

NSW Part H1 Structure · varies H1P1 Structural reliability and resistance

Open on NCC Online ↗

Delete clause H1P1 and insert NSW H1P1 as follows:

(1) By resisting the actions to which it may reasonably be expected to be subjected, a building or structure, during construction and use, with appropriate degrees of reliability, must—

perform adequately under all reasonably expected design actions; and

withstand extreme or frequently repeated design actions; and

be designed to sustain local damage, with the structural system as a remaining stable and not being damaged to an extent disproportionate to the original local damage; and

avoid causing damage to other properties.

(2) The actions to be considered to satisfy (1) include but are not limited to—

permanent actions (dead loads); and

imposed actions (live loads arising from occupancy and use); and

wind action; and

earthquake action; and

snow action; and

liquid pressure action; and

ground water action; and

rainwater action (including ponding action); and

earth pressure action; and

differential movement; and

time dependent effects (including creep and shrinkage); and

thermal effects; and

ground movement caused by—

swelling, shrinkage or freezing of the subsoil; and

landslip or subsidence; and

siteworks associated with the building or structure; and

construction activity actions; and

termite actions.

(3) The structural resistance of materials and forms of construction must be determined using five percentile characteristic material properties with appropriate allowance for—

known construction activities; and

type of material; and

characteristics of the site; and

the degree of accuracy inherent in the methods used to assess the structural behaviour; and

action effects arising from the differential settlement of foundations, and from restrained dimensional changes due to temperature, moisture, shrinkage, creep and similar effects.

(4) Glass installations that are at risk of being subjected to human impact must have glazing that—

if broken on impact, will break in a way that is not likely to cause injury to people; and

resists a reasonably foreseeable human impact without breaking; and

is protected or marked in a way that will reduce the likelihood of human impact.

New in NCC 2025. No NSW H1P1 in NCC 2022 Volume Two; it may have moved or been renumbered.

The national clause