Deemed-to-Satisfy Provision · NCC 2025 Volume One

F4D10 Microbial (legionella) control

Part F4 Sanitary and other facilities · NCC 2019: F2.7

Open F4D10 on NCC Online ↗
Varied in NSW. Check the variation for your state.

Hot water, warm water and cooling water systems in a building other than a system serving only a single sole-occupancy unit in a Class 2 or 3 building or Class 4 part of a building must be installed in accordance with AS/NZS 3666.1.

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One F4D10.
Can't meet F4D10? A Performance Solution must meet the Performance Requirements it satisfies: F4P1, F4P2, F4P3, F4P4, F4P5, F4P6. Start a Performance Solution →

State and territory variations all clauses side by side →

Defined terms used