F8D3 External wall construction
Part F8 Condensation management · NCC 2019: F6.2
(1) Where a pliable building membrane or a sarking-type material is installed as a control layer in an external wall, it must—
comply with AS 4200.1; and
be installed in accordance with AS 4200.2.
(2) Subject to (5), any control layer incorporated between the cladding and the exterior side of the primary insulation layer in an external wall must achieve the vapour permeance specified in Table F8D3.
(3) Subject to (4) and (5), an external wall without a pliable building membrane or a water barrier between the cladding and the exterior side of the primary insulation layer, must incorporate a drained and ventilated cavity.
(4) Subject to (5), for the purposes of (2) and (3), a drained and ventilated cavity must—
be located between the cladding and the external side of the primary insulation layer, or the outermost control layer; and
constructed from cavity battens, spacers or the like where applicable with a depth of at least 12 mm; and
be unobstructed by any control layer; and
be drained to the exterior, including where cavities are vertically compartmentalised in a multi-storey building; and
have openings with a free area of not less than 1,000 mm2/m of wall provided at—
the base and top of the cavity; or
each storey or level to where the cavity is closed.
(5) The requirements of (2), (3) and (4) do not apply to a—
single skin masonry wall; or
single skin concrete wall; or
wall constructed from insulated sandwich panels for the full extent of the external wall; or
wall that does not form part of the building envelope; or
portion of the external wall below natural ground level.
Table F8D3 Vapour permeance requirements
Climate zone
Wall construction
Vapour permeance (µg/N.s)
1
No cavity
≥ 0.0022 to < 1.1403
Drained and ventilated cavity
≥ 0 to < 1.1403
3
No cavity
≥ 0.1429
Drained and ventilated cavity
≥ 0.0022
4, 5
No cavity
≥ 1.1403
Drained and ventilated cavity
≥ 0.1429
6, 7, 8
No cavity
X
Drained and ventilated cavity
≥ 1.1403
Table Notes
X = A cavity must be provided in climate zones 6, 7 and 8.
Tables
Changed since NCC 2022. See NCC 2022 Volume One F8D3, or show what changed.
(1) Where a pliable building membrane or a sarking-type material is installed as a control layer in an external wall, it must — comply with AS 4200.1; and be installed in accordance with AS 4200.2; 4200.2. (2) Subject to (5), any control layer incorporated between the cladding and be located on the exterior side of the primary insulation layer of in an external wall assemblies that form must achieve the vapour permeance specified in Table F8D3. (3) Subject to (4) and (5), an external envelope of a building. (2) Where wall without a pliable building membrane, sarking-type material membrane or insulation layer is installed on a water barrier between the cladding and the exterior side of the primary insulation layer layer, must incorporate a drained and ventilated cavity. (4) Subject to (5), for the purposes of an (2) and (3), a drained and ventilated cavity must — be located between the cladding and the external wall it must side of the primary insulation layer, or the outermost control layer; and constructed from cavity battens, spacers or the like where applicable with a depth of at least 12 mm; and be unobstructed by any control layer; and be drained to the exterior, including where cavities are vertically compartmentalised in a multi-storey building; and have openings with a vapour permeance free area of not less than 1,000 mm2/m of wall provided at — in climate zones 4 the base and 5, 0.143 µg/N.s; top of the cavity; or each storey or level to where the cavity is closed. (5) The requirements of (2), (3) and (4) do not apply to a — single skin masonry wall; or single skin concrete wall; or wall constructed from insulated sandwich panels for the full extent of the external wall; or wall that does not form part of the building envelope; or portion of the external wall below natural ground level. Table F8D3 Vapour permeance requirements Climate zone Wall construction Vapour permeance (µg/N.s) 1 No cavity ≥ 0.0022 to < 1.1403 Drained and ventilated cavity ≥ 0 to < 1.1403 3 No cavity ≥ 0.1429 Drained and ventilated cavity ≥ 0.0022 4, 5 No cavity ≥ 1.1403 Drained and ventilated cavity ≥ 0.1429 6, 7, 8 No cavity X Drained and ventilated cavity ≥ 1.1403 Table Notes X = A cavity must be provided in climate zones 6, 7 and 8, 1.14 µg/N.s. (3) Except for single skin masonry and single skin concrete, where a pliable building membrane is not installed in an external wall, the primary water control layer must be separated from water sensitive materials by a drained cavity. 8.
Removed words are struck through; added words are highlighted. Comparison of the text only.