Table · NCC 2025 Volume One
Table F8D3 Vapour permeance requirements
Part F8 Condensation management
| Climate zone | Wall construction | Vapour permeance (µg/N.s) |
|---|---|---|
| 1 | No cavity | ≥ 0.0022 to < 1.1403 |
| Drained and ventilated cavity | ≥ 0 to < 1.1403 | |
| 3 | No cavity | ≥ 0.1429 |
| Drained and ventilated cavity | ≥ 0.0022 | |
| 4, 5 | No cavity | ≥ 1.1403 |
| Drained and ventilated cavity | ≥ 0.1429 | |
| 6, 7, 8 | No cavity | X |
| Drained and ventilated cavity | ≥ 1.1403 |
Table Notes
X = A cavity must be provided in climate zones 6, 7 and 8.
Table for F8D3 External wall construction
New in NCC 2025. No Table F8D3 in NCC 2022 Volume One; it may have moved or been renumbered.