Verification Method · NCC 2025 Volume One

G5V1 Buildings in bushfire prone areas

Part G5 Construction in bushfire prone areas · NCC 2019: GV5

Open G5V1 on NCC Online ↗
Varied in NSW. Check the variation for your state.

(1) Compliance with Performance Requirement G5P1 is verified if the ignition probability for a building exposed to a design bushfire does not exceed 10%.

(2) Bushfire design actions must be determined in consideration of the annual probability of a design bushfire derived from—

assigning the building or structure with an Importance Level in accordance with (3); and

determining the corresponding annual probability of exceedance in accordance with Table G5V1.

(3) A building or structure's Importance Level must be identified as one of the following:

Importance Level 1 — where the building or structure presents a low degree of hazard to life and other property in the case of failure.

Importance Level 2 — where the building or structure is not of Importance Level 1, 3 or 4 or is a Class 2 building accommodating 12 people or less.

Importance Level 3 — where the building is designed to contain a large number of people and is a—

Class 2 building accommodating more than 12 people; or

Class 3 boarding house, guest house, hostel, lodging house or backpackers accommodation; or

Class 3 residential part of a hotel or motel; or

Class 3 residential part of a school.

Importance Level 4 — where the building or structure is—

essential to emergency management or post-disaster recovery; or

associated with hazardous facilities; or

subject to a necessary ‘defend in place’ strategy and is a—

Class 3 accommodation building for the aged, children or people with disabilities; or

Class 3 residential part of a health-care building which accommodates members of staff; or

Class 3 residential part of a detention centre; or

building that operates in the event of a bushfire emergency, such as a public bushfire shelter or a bushfire emergency control centre.

(4) The ignition probability for a building must be assessed by application of the following:

An event tree analysis of relevant bushfire scenarios.

Design bushfire conditions that include combinations of the following actions appropriate to the distance between the building and the bushfire hazard:

Direct attack from airborne burning embers.

Burning debris and accumulated embers adjacent to a building element.

Radiant heat from a bushfire front.

Direct flame attack from a bushfire front.

(5) Applied fire actions must allow for reasonable variations in—

fire weather; and

vegetation, including fuel load, burning behaviour of vegetation (including the potential for crown fires); and

the distance of the building from vegetation; and

topography, including slopes and features that may shield; and

ignition of adjacent buildings, building elements, plants, mulch and other materials; and

effective size of fire front; and

duration of exposure; and

flame height; and

flame tilt; and

flame adhesion to sloping land; and

the height of the building and its elements.

(6) The assessment process must include consideration of—

the probability of non-complying construction of critical aspects of an approved design; and

the probability of critical aspects of an approved design being fully functional during the life of the building; and

inclusion of safety factors; and

sensitivity analysis of critical aspects of a proposed design.

Limitations

G5V1 does not apply to a Class 9 building.

Notes

For a building that is subject to G5P2, and therefore outside the scope of G5V1, the building would need to comply with either—

Performance Requirement G5P2 by means of a Performance Solution; or

the Deemed-to-Satisfy Provisions of G5D4 if the building is located in an area subject to a Bushfire Attack Level (BAL) not exceeding BAL – 12.5.

Table G5V1 Annual Probability of Exceedance (APE) for design bushfire actions

Importance Level

Complex analysis APE for bushfire exposure

Simple analysis APE for weather conditions (design bushfire)

1

No requirement

No requirement

2

1:500

1:50

3

1:1000

1:100

4

1:2000

1:200

Table Notes

Complex analysis must consider the probability of ignition, fire spread to the urban interface and penetration of the urban interface coincident with fire weather conditions.

Tables

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One G5V1.

State and territory variations all clauses side by side →

Clauses referred to

Defined terms used