Specification clause · NCC 2025 Volume One
S19C3 Purpose and content of fire control centre
Specification 19 Fire control centres · NCC 2019: Spec E1.8: 2
A fire control centre must—
provide an area from which fire-fighting operations or other emergency procedures can be directed or controlled; and
contain controls, panels, telephones, furniture, equipment and the like associated with the required fire services in the building; and
not be used for any purpose other than the control of—
fire-fighting activities; and
other measures concerning the occupant safety or security.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One S19C3.