Specification clause · NCC 2022 Volume One

S19C3 Purpose and content of fire control centre

Specification 19 Fire control centres · NCC 2019: Spec E1.8: 2

Open S19C3 on NCC Online ↗

A fire control centre must—

provide an area from which fire-fighting operations or other emergency procedures can be directed or controlled; and

contain controls, panels, telephones, furniture, equipment and the like associated with the required fire services in the building; and

not be used for any purpose other than the control of—

fire-fighting activities; and

other measures concerning the occupant safety or security.

Same wording in NCC 2025 Volume One. See NCC 2025 Volume One S19C3.

Defined terms used