Specification clause · NCC 2025 Volume One

S31C11 Upward air velocity

Specification 31 Fire and smoke control systems in buildings containing atriums · NCC 2019: Spec G3.8: 3.5

Open S31C11 on NCC Online ↗

Notwithstanding S31C10(c), the average upward air velocity in the atrium, due to the required smoke exhaust quantity must—

be not less than 0.2 m/s at any level over an 18 m height above the floor of the atrium; and

not exceed the following maximum velocities in atriums of constant cross sectional plan area:

For occupancy classification qualifying for 1.5 MW fire size — 3.5 m/s.

For occupancy classifications qualifying for 5 MW fire size — 5 m/s.

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One S31C11.

Clauses referred to

Defined terms used