Specification clause · NCC 2025 Volume One

S33C3 Additional requirements — Green Star

Specification 33 Additional requirements · NCC 2019: Spec JVa: 4

Open S33C3 on NCC Online ↗

Where not included in the building energy simulation to satisfy J1V2(1), compliance must be achieved with—

for heating, cooling and ventilation equipment outside the scope of the Green Star model, Part J6; and

for artificial lighting outside the scope of the Green Star model, Part J7.

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One S33C3.

Clauses referred to

Defined terms used