Specification clause · NCC 2025 Volume One

S33C2 Additional requirements — general

Specification 33 Additional requirements · NCC 2019: Spec JVa: 2

Open S33C2 on NCC Online ↗

(1) In addition to the modelling requirements for J1V1, J1V2, and J1V3, a building must comply with—

for general thermal construction, J4D3; and

for floor edge insulation, J4D7(3) and J4D7(4); and

for building sealing, J1V4 or J5; and

for deactivation, control and insulation of air-conditioning and mechanical ventilation systems—

J6D3(1)(a); and

J6D3(1)(b); and

J6D3(1)(c)(i)

J6D3(1)(e); and

J6D3(2); and

J6D3(3); and

J6D3(4)

J6D3(5)

J6D4(3); and

J6D4(4); and

J6D4(5)

J6D4(6)

J6D4(7)

J6D5; and

J6D6; and

J6D9; and

for testing water-to-air package air-conditioning equipment not less than 65 kW, AS/NZS ISO 13256.1 at test condition C3; and

for testing a refrigeration chiller, AHRI 551/591; and

for interior artificial lighting and power control, J7D4; and

for interior decorative and display lighting, J7D5; and

for artificial lighting around the exterior of a building, J7D6; and

for boiling water and chilled water storage units, J7D7; and

for deactivation of swimming pool heating and pumping, J8D4(2)(b) and J8D4(3); and

for deactivation of spa pool heating and pumping, J8D5(2)(b) and J8D5(3); and

for facilities for energy monitoring, Part J9; and

for deactivation of fixed outdoor space heating appliances, clause J6D10(3).

for facilitating the future replacement of gas-powered appliances with electrically-powered appliances—

J6D10 (5), (6) and (7); and

J8D3(3) and (4); and

J8D4 (6) and (7); and

J8D5(6) and (7).

(2) In addition to the requirements of (1), a building using J1V1 must comply with J9D5(2) to (4) for facilities for solar photovoltaic panels.

Changed since NCC 2022. See NCC 2022 Volume One S33C2, or show what changed.

(1) In addition to the modelling requirements for J1V1, J1V2, J1V3 and J1V5, J1V3, a building must comply with — for general thermal construction, J4D3; and for floor edge insulation, J4D7(2) J4D7(3) and J4D7(3); J4D7(4); and for building sealing, J1V4 or J5; and for deactivation, control and insulation of air-conditioning and mechanical ventilation systems — J6D3(1)(a); and J6D3(1)(b)(i); J6D3(1)(b); and J6D3(1)(d); and J6D3(1)(f); J6D3(1)(c)(i) J6D3(1)(e); and J6D3(2); and J6D3(3); and J6D4(2); J6D3(4) J6D3(5) J6D4(3); and J6D4(4); and J6D4(5) J6D4(6) J6D4(7) J6D5; and J6D6; and J6D9; and for testing water-to-air package air-conditioning equipment not less than 65 kWr, kW, AS/NZS 3823.1.2 ISO 13256.1 at test condition T1; C3; and for testing a refrigeration chiller, AHRI 551/591; and for … J7D7; and for deactivation of swimming pool heating and pumping, J8D3(2)(b) J8D4(2)(b) and J8D3(3); J8D4(3); and for deactivation of spa pool heating and pumping, J8D4(2)(b) J8D5(2)(b) and J8D4(3); J8D5(3); and for facilities for energy monitoring, Part J9; and for deactivation of fixed outdoor space heating appliances, clause J6D10(3). for facilitating the future replacement of gas-powered appliances with electrically-powered appliances — J6D10 (5), (6) and (7); and J8D3(3) and (4); and J8D4 (6) and (7); and J8D5(6) and (7). (2) In addition to the requirements of (1), a building using J1V1 must comply with J9D5(2) to (4) for facilities for solar photovoltaic panels.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Clauses referred to

Defined terms used