S33C2 Additional requirements — general
Specification 33 Additional requirements · NCC 2019: Spec JVa: 2
(1) In addition to the modelling requirements for J1V1, J1V2, and J1V3, a building must comply with—
for general thermal construction, J4D3; and
for floor edge insulation, J4D7(3) and J4D7(4); and
for building sealing, J1V4 or J5; and
for deactivation, control and insulation of air-conditioning and mechanical ventilation systems—
J6D3(1)(a); and
J6D3(1)(b); and
J6D3(1)(c)(i)
J6D3(1)(e); and
J6D3(2); and
J6D3(3); and
J6D3(4)
J6D3(5)
J6D4(3); and
J6D4(4); and
J6D4(5)
J6D4(6)
J6D4(7)
J6D5; and
J6D6; and
J6D9; and
for testing water-to-air package air-conditioning equipment not less than 65 kW, AS/NZS ISO 13256.1 at test condition C3; and
for testing a refrigeration chiller, AHRI 551/591; and
for interior artificial lighting and power control, J7D4; and
for interior decorative and display lighting, J7D5; and
for artificial lighting around the exterior of a building, J7D6; and
for boiling water and chilled water storage units, J7D7; and
for deactivation of swimming pool heating and pumping, J8D4(2)(b) and J8D4(3); and
for deactivation of spa pool heating and pumping, J8D5(2)(b) and J8D5(3); and
for facilities for energy monitoring, Part J9; and
for deactivation of fixed outdoor space heating appliances, clause J6D10(3).
for facilitating the future replacement of gas-powered appliances with electrically-powered appliances—
J6D10 (5), (6) and (7); and
J8D3(3) and (4); and
J8D4 (6) and (7); and
J8D5(6) and (7).
(2) In addition to the requirements of (1), a building using J1V1 must comply with J9D5(2) to (4) for facilities for solar photovoltaic panels.
Changed since NCC 2022. See NCC 2022 Volume One S33C2, or show what changed.
(1) In addition to the modelling requirements for J1V1, J1V2, J1V3 and J1V5, J1V3, a building must comply with — for general thermal construction, J4D3; and for floor edge insulation, J4D7(2) J4D7(3) and J4D7(3); J4D7(4); and for building sealing, J1V4 or J5; and for deactivation, control and insulation of air-conditioning and mechanical ventilation systems — J6D3(1)(a); and J6D3(1)(b)(i); J6D3(1)(b); and J6D3(1)(d); and J6D3(1)(f); J6D3(1)(c)(i) J6D3(1)(e); and J6D3(2); and J6D3(3); and J6D4(2); J6D3(4) J6D3(5) J6D4(3); and J6D4(4); and J6D4(5) J6D4(6) J6D4(7) J6D5; and J6D6; and J6D9; and for testing water-to-air package air-conditioning equipment not less than 65 kWr, kW, AS/NZS 3823.1.2 ISO 13256.1 at test condition T1; C3; and for testing a refrigeration chiller, AHRI 551/591; and for … J7D7; and for deactivation of swimming pool heating and pumping, J8D3(2)(b) J8D4(2)(b) and J8D3(3); J8D4(3); and for deactivation of spa pool heating and pumping, J8D4(2)(b) J8D5(2)(b) and J8D4(3); J8D5(3); and for facilities for energy monitoring, Part J9; and for deactivation of fixed outdoor space heating appliances, clause J6D10(3). for facilitating the future replacement of gas-powered appliances with electrically-powered appliances — J6D10 (5), (6) and (7); and J8D3(3) and (4); and J8D4 (6) and (7); and J8D5(6) and (7). (2) In addition to the requirements of (1), a building using J1V1 must comply with J9D5(2) to (4) for facilities for solar photovoltaic panels.
Removed words are struck through; added words are highlighted. Comparison of the text only.
Clauses referred to
- J1V1 NABERS Energy
- J1V2 Green Star
- J1V3 Verification using a reference building
- J4D3 Thermal construction — general
- J4D7 Floors
- J1V4 Verification of building envelope sealing
- J6D3 Air-conditioning system control
- J6D4 Mechanical ventilation system control
- J6D5 Fans and duct systems
- J6D6 Ductwork insulation
- J6D9 Pipework insulation
- J7D4 Interior artificial lighting and power control
- J7D5 Interior decorative and display lighting
- J7D6 Exterior artificial lighting
- J7D7 Boiling water and chilled water storage units
- J8D4 Swimming pool heating and pumping
- J8D5 Spa pool heating and pumping
- J6D10 Space heating
- J8D3 Heated water supply
- J9D5 Facilities for solar photovoltaic and battery systems