S6C5 Additional requirements for lift shafts
Specification 6 Structural tests for lightweight construction · NCC 2019: Spec C1.8: 3.3
(1) In addition to the requirements of S6C3 and S6C4, a wall system for use in a lift shaft that is required to be fire-resisting must be subjected to dynamic test by the imposition of—
where the lift car speed is 7 m/s or less — 106 cycles of a uniformly distributed load between 0 and 0.2 kPa (or its equivalent); or
where the lift car speed is greater than 7 m/s — 106 cycles of a uniformly distributed load between 0 and 0.35 kPa (or its equivalent) in accordance with S6C10(e) and must fulfil the damage criteria of S6C11(b).
(2) The wall system must be subjected to the static test in accordance with S6C4(b) after the successful conclusion of the dynamic test specified in (1).
Clauses referred to
- S6C3 Walls of certain Class 9b buildings
- S6C4 Walls of shafts and fire-isolated exits generally
- S6C10 Test methods
- S6C11 Criteria for compliance