Tasmania variation · NCC 2025 Volume One
TAS I14D5 Ceiling construction
TAS Part I14 Premises for electro-plating, electro-polishing, anodising or etching
Delete clause I14D5 and insert TAS I14D5 as follows:
The ceiling of a plating area must be so constructed as to prevent, so far as is practicable, atmospheric contaminants from escaping into rooms or work places, situated above the level of the ceiling.
Changed since NCC 2022. See NCC 2022 Volume One TAS I14D5, or show what changed.
Delete clause I14D5 and insert TAS I14D5 as follows: The ceiling of a plating area must be so constructed … or work places, situated above the level of the ceiling.
Removed words are struck through; added words are highlighted. Comparison of the text only.