Tasmania variation · NCC 2025 Volume One
TAS I15D3 Height of lead processing areas
TAS Part I15 Premises for lead processing
Delete clause I15D3 and insert TAS I15D3 as follows:
Every part of a lead processing area must be not less than 2.7 m in height—
where a ceiling is provided, measured from the floor to the ceiling; or
where a ceiling is not provided, measured from the floor to the lowest part of the roof.
Changed since NCC 2022. See NCC 2022 Volume One TAS I15D3, or show what changed.
Delete clause I15D3 and insert TAS I15D3 as follows: Every part of a lead processing area must be not … from the floor to the lowest part of the roof.
Removed words are struck through; added words are highlighted. Comparison of the text only.