Housing Provisions clause · ABCB Housing Provisions 2022

10.2.29 Membrane to drainage connection

Part 10.2 Wet area waterproofing

Open 10.2.29 on NCC Online ↗

(1) Membrane drainage connections in concrete floors must comply with one of the following:

A drainage flange must be installed with the waterproofing membrane terminated at or in the drainage flange to provide a waterproof connection (see Figure 10.2.29).

Where a preformed shower base is used, provision must be made to drain the tile bed and provide a waterproof connection to the drain.

(2) For membrane drainage connections in other floors, a drainage flange must be installed with the waterproofing membrane terminated at or in the drainage flange to provide a waterproof connection (see Figure 10.2.29).

(3) Where a preformed shower base is used, provision must be made to drain the tile bed and provide a waterproof connection to the drain.

(4) Floor wastes must be of sufficient height to suit the thickness of the tile and tile bed at the outlet position.

Figure 10.2.29 Typical membrane termination at drainage outlet

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 10.2.29.

Defined terms used