Housing Provisions clause · ABCB Housing Provisions 2022

4.2.3 Excavation for footings

Part 4.2 Footings, slabs and associated elements · NCC 2019: 3.2.2.1, NSW 3.3.3.1(e)

Open 4.2.3 on NCC Online ↗
Varied in NSW. Check the variation for your state.

(1) Excavation for footings, including thickenings for slabs and pads must be clean cut with vertical sides, wherever possible.

(2) The base of the excavation must be—

for flat sites, generally level but may slope not more than 1:40 to allow excavations to drain; and

for sloping sites at an angle of not more than 1:10; and

for stepped footings in accordance with 4.2.7.

(3) Footing excavations must be free of loose earth, tree roots, mud or debris.

(4) Topsoil containing grass roots must be removed from the site of the foundation.

(5) Excavation depths and soil cuts must comply with Part 3.2.

(6) On loose sand sites or sites subject to wind or water erosion, the depth below finished ground level to the bottom of footings must be not less than 300 mm.

(7) The height of a finished slab-on-ground must be in accordance with 3.3.3(b).

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 4.2.3.

State and territory variations all clauses side by side →

Clauses referred to

Defined terms used