Housing Provisions clause · ABCB Housing Provisions 2022

4.2.6 Slab edge support on sloping sites

Part 4.2 Footings, slabs and associated elements · NCC 2019: 3.2.2.4

Open 4.2.6 on NCC Online ↗

Footings and slabs installed on the low side of sloping sites must be as follows:

Slab panels — in accordance with 4.2.5(a).

Edge beams—

supported by controlled fill in accordance with 4.2.5(b) (see Figure 4.2.5, Option 1); or

supported by deepened edge beams or bulk piers designed in accordance with AS 3600 (see Figure 4.2.5, Option 2); or

deepened (as per AS 2870) to extend into the natural soil level with a bearing capacity in accordance with 4.2.5(b) (see Figure 4.2.5, Option 3); or

stepped in accordance with AS 2870.

Edge beams not connected to the slab, pad footings and strip footings — founded in accordance with 4.2.5(c).

Where an excavation (cut) of the natural ground is used it must be in accordance with Part 3.2.

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 4.2.6.

Clauses referred to

Defined terms used