7.3.4 Sarking
Part 7.3 Roof tiles and shingles · NCC 2019: 3.5.2.4
Sarking must—
be provided in accordance with Table 7.3.4; and
comply with AS 4200.1 and be installed with—
each adjoining sheet or roll being—
overlapped not less than 150 mm; or
taped together; and
sarking fixed to supporting members at not more than 300 mm centres; and
no sags more than 40 mm in the sarking.
Table 7.3.4 Sarking requirements for tiled roofs
Roof pitch
Maximum rafter/truss top chord length without sarking (mm) Note 1
<18°
N/A Note 2
≥18° <20°
4 500
≥20° <22°
5 500
≥22°
6 000
Table Notes
The maximum rafter/truss top chord length is measured from the topmost point of the rafter/truss i.e. the apex downwards. Where the maximum length is exceeded, sarking must be installed over the remainder of the rafter/truss top chord length towards the eave line of the roof, or equivalent where the building has no eaves.
All tiled roofs with a pitch less than 18 degrees must be provided with sarking, regardless of rafter/truss chord length.