Northern Territory variation · ABCB Housing Provisions 2022

NT 3.4.2 Termite management systems

Part 3.4 Termite risk management · varies 3.4.2 Termite management systems

Open on NCC Online ↗

Delete clause 3.4.2 and insert NT 3.4.2 as follows:

Where a termite management system is required it must—

be selected appropriate to Table 3.4.2; and

comply with—

AS 3660.1; or

have been tested and passed the tests required by Section 5 of AS 3660.3; and

have a durable notice installed in accordance with 3.4.3; and

include additional termite risk management measures in areas where Mastotermes darwiniensis are prevalent; and

where a chemical termite management system is used—

the chemical must be included on the appropriate authority’s pesticides register; and

when used as an external perimeter termite management system for Mastotermes darwiniensis, it is—

installed by excavating trenches, treating the exposed trench and backfilling the trench with treated material; and

covered by a concrete strip not less than 50 mm thick and 300 mm wide measured from the external wall of the building.

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 NT 3.4.2.

The national clause

Other states and territories