Deemed-to-Satisfy Provision · NCC 2022 Volume One
E1D1 Deemed-to-Satisfy Provisions
Part E1 Fire fighting equipment · NCC 2019: TAS E1.0, E1.0
Varied in TAS. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements E1P1 to E1P6 are satisfied by complying with—
in a building containing an atrium, Part G3; and
in a building in an alpine area, Part G4; and
for a building containing an occupiable outdoor area, Part G6; and
for additional requirements for Class 9b buildings, Part I1; and
for farm buildings and farm sheds, Part I3.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Same wording in NCC 2025 Volume One. See NCC 2025 Volume One E1D1.
State and territory variations all clauses side by side →
Clauses referred to
- E1P1 Fire hose reels
- E1P6 Fire control centres
- E1D2 Fire hydrants
- E1D17 Provision for special hazards
- A2G2 Performance Solution
- A2G4 A combination of solutions