Deemed-to-Satisfy Provision · NCC 2022 Volume One

F8D5 Ventilation of roof spaces

Part F8 Condensation management · NCC 2019: F6.4

Open F8D5 on NCC Online ↗

(1) In climate zones 6, 7 and 8, a roof must have a roof space that—

is located—

immediately above the primary insulation layer; or

immediately above sarking with a vapour permeance of not less than 1.14 μg/N.s, which is immediately above the primary insulation layer; or

immediately above ceiling insulation which meets the requirements of J3D7(3) and J3D7(4); and

has a height of not less than 20 mm; and

is either—

ventilated to outdoor air through evenly distributed openings in accordance with Table F8D5; or

located immediately underneath roof tiles of an unsarked tiled roof.

(2) The requirements of (1) do not apply to a—

concrete roof; or

roof that is made of structural insulated panels; or

roof that is subject to Bushfire Attack Level FZ requirements in accordance with AS 3959.

Table F8D5 Roof space ventilation requirements

Roof pitch

Ventilation openings

<10°

25,000 mm2/m provided at each of two opposing ends

≥10° and <15°

25,000 mm2/m provided at the eaves and 5,000 mm2/m at high level

≥15° and <75°

7,000 mm2/m provided at the eaves and 5,000 mm2/m at high level, plus an additional 18,000 mm2/m at the eaves if the roof has a cathedral ceiling

Table Notes

Ventilation openings are specified as a minimum free open area per metre length of the longest horizontal dimension of the roof.

For the purposes of this table, high level openings are openings provided at the ridge or not more than 900 mm below the ridge or highest point of the roof space, measured vertically.

Tables

Changed in NCC 2025. See NCC 2025 Volume One F8D5, or show what changed.

(1) In climate zones 6, 7 and 8, a roof with the primary insulation layer not parallel to the roof plane must have a roof space that — has a height not less than 18 mm at any point between the primary insulation layer and the underside of the roof or a control layer; and is located — immediately above the primary insulation layer; or immediately above sarking with a vapour permeance of not less than 1.14 μg/N.s, which is immediately above the primary insulation layer; or immediately above ceiling insulation which meets the requirements of J3D7(3) and J3D7(4); and has a height of not less than 20 mm; and is either — ventilated to outdoor air through evenly distributed openings air, in accordance with Table F8D5; or located immediately underneath roof tiles of an unsarked tiled roof. F8D5. (2) The requirements of (1) do not apply to a — concrete roof; or roof that is made of structural insulated sandwich panels; or roof that is subject to Bushfire Attack Level FZ requirements in accordance with AS 3959. tiled roof without a control layer. Table F8D5 Roof space ventilation requirements Roof pitch Ventilation openings <10° 25,000 20,000 mm2/m provided at eaves or low level, or at each of two opposing ends ≥10° for gable roofs For roofs less than 10 m2, 7,000 mm2/m provided at eaves or low level roof perimeter and <15° 25,000 5,000 mm2/m provided at ridge or high level for skillion roofs 20,000 mm2/m provided at the eaves or low level and 5,000 mm2/m provided at ridge or high level ≥15° for skillion roofs ≥10° and <75° 7,000 mm2/m provided at the eaves or low level and 5,000 mm2/m provided at high level, plus an additional 18,000 mm2/m at the eaves if the roof has a cathedral ceiling level or ridge Table Notes Ventilation openings are specified as a minimum free open area per metre length. The longest total plan dimension is based on the roof length irrespective of the number of storeys beneath. Total low level ventilation openings are calculated based on twice the longest horizontal total plan dimension of the roof, except for mono pitch or skillion roofs that are calculated based on the longest total plan dimension of the roof. For Total high level ventilation is calculated based on the purposes longest total plan dimension of this table, high the roof. High level openings are openings provided at the ridge or not … the ridge or highest point of the roof space, measured vertically. vertically or 1/3 of the height of the roof below highest point of the roof, whichever is least.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet F8D5? A Performance Solution must meet the Performance Requirements it satisfies: F8P1. Start a Performance Solution →

Clauses referred to

Defined terms used