Deemed-to-Satisfy Provision · NCC 2022 Volume One

G3D6 Separation at roof

Part G3 Atrium construction · NCC 2019: G3.6

Open G3D6 on NCC Online ↗

In an atrium—

the roof must have the FRL prescribed in Table S5C11g; or

the roof structure and membrane must be protected by a sprinkler system (other than a FPAA101D or FPAA101H system) complying with Specification 17.

Same wording in NCC 2025 Volume One. See NCC 2025 Volume One G3D6.

Defined terms used