Deemed-to-Satisfy Provision · NCC 2025 Volume One
G3D6 Separation at roof
Part G3 Atrium construction · NCC 2019: G3.6
In an atrium —
the roof must have the FRL prescribed in Table S5C11g; or
the roof structure and membrane must be protected by a sprinkler system (other than a FPAA101D or FPAA101H system) complying with Specification 17.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One G3D6.