Deemed-to-Satisfy Provision · NCC 2022 Volume One

I1D1 Application of Part

Part I1 Class 9b buildings · NCC 2019: NSW H1.1, H1.1

Open I1D1 on NCC Online ↗
Varied in NSW. Check the variation for your state.

(1) The Deemed-to-Satisfy Provisions of this Part apply to every enclosed Class 9b building or part of a building which—

is a school assembly, church or community hall with a stage and any backstage area with a total floor area of more than 300 m2; or

otherwise, has a stage and any backstage area with a total floor area of more than 200 m2; or

has a stage with an associated rigging loft.

(2) Notwithstanding (1)—

I1D4 applies to every open or enclosed Class 9b building; and

I1D7 applies to every enclosed Class 9b building.

Same wording in NCC 2025 Volume One. See NCC 2025 Volume One I1D1.

State and territory variations all clauses side by side →

Clauses referred to

Defined terms used