Deemed-to-Satisfy Provision · NCC 2022 Volume One

J9D5 Facilities for solar photovoltaic and battery systems

Part J9 Energy monitoring and on-site distributed energy resources

Open J9D5 on NCC Online ↗

(1) The main electrical switchboard of a building must—

contain at least two empty three-phase circuit breaker slots and four DIN rail spaces labelled to indicate the use of each space for—

a solar photovoltaic system; and

a battery system; and

be sized to accommodate the installation of solar photovoltaic panels producing their maximum electrical output on at least 20% of the building roof area.

(2) At least 20% of the roof area of a building must be left clear for the installation of solar photovoltaic panels, except for buildings—

with installed solar photovoltaic panels on—

at least 20% of the roof area; or

an equivalent generation capacity elsewhere on-site; or

where 100% of the roof area is shaded for more than 70% of daylight hours; or

with a roof area of not more than 55 m2; or

where more than 50% of the roof area is used as a terrace, carpark, roof garden, roof light or the like.

Limitations

The requirements of J9D5(1)(a)(i) and (b) do not apply to a building with solar photovoltaic panels installed on at least 20% of the roof area.

The requirements of J9D5(1)(a)(ii) and (b) do not apply to a building with battery systems installed.

Changed in NCC 2025. See NCC 2025 Volume One J9D5, or show what changed.

(1) The main electrical switchboard of a building must — contain at least two 2 empty three-phase three-phrase circuit breaker slots and four 4 DIN rail spaces labelled to indicate the use of each space for — a battery system. (2) A building must be provided with an on-site solar photovoltaic system; and system — that covers 100% of the roof area, excluding areas — shaded for more than 25% of annual daylight hours; or where the roof pitch exceeds 45° relative to horizontal; or that are awnings; or that are car parks; or that are roof gardens; or that are terraces or other rooftop areas designated for occupation; or used for roof lights or translucent roofing for natural lighting or the like; or designated as a battery system; and be sized trafficable area, access for height safety systems or plant maintenance access or a required path of travel to accommodate an exit; or used for plant equipment, services installations or the installation like; or above exhaust air flows from heat rejection equipment or the like; or where provision of solar photovoltaic panels producing their maximum electrical panel is impractical on account of panel size or mounting system limitations; or with a peak system output on at least 20% rating per m2 of the building roof area. (2) At least 20% of the roof area of conditioned space not less than those specified in Table J9D5a. (3) In addition to (2), a building where gas is used for building services must be left clear for provided with further on-site photovoltaic system peak output capacity not less than the installation of value specified in Table J9D5b. (4) If the on-site solar photovoltaic panels, except system in (3) is placed on a building roof, the panels must — not be shaded for buildings more than 25% of daylight hours; and not have a pitch of more than 45°. Limitations The requirements of J9D5(2) do not apply to a building — with installed solar photovoltaic panels on — at least 20% of the roof area; or an equivalent generation capacity elsewhere on-site; or where 100% of the effective roof area is shaded for more than 70% of annual daylight hours; or provided with an on-site renewable energy generation system with a roof area of not more than 55 m2; or where more than 50% of the roof area is used as generation capacity at least equivalent to a terrace, carpark, roof garden, roof light or the like. Limitations solar photovoltaic system described under J9D5(2). The requirements of J9D5(1)(a)(i) and (b) do not apply to a building with solar photovoltaic panels installed on at least 20% of the roof area. The requirements of J9D5(1)(a)(ii) and (b) J9D5(1) do not apply to a building with battery systems installed. Table J9D5a Minimum solar photovoltaic system installed peak output (W) per m2 of conditioned space for buildings without gas Building Class Climate zone 1 Climate zones 2 to 7 Climate zone 8 Class 5, 6, and 7 95 65 55 Class 3 and 9 70 40 35 Table J9D5b Minimum solar photovoltaic system installed peak output (W) per m2 of conditioned space for buildings with gas, in addition to the requirements of J9D5(2) Building Class Climate zones 1 and 3 Climate zones 2 and 5 Climate zones 4 and 6 Climate zone 7 Climate zone 8 Class 5, 6 and 7 0 0 1 1.7 4.7 Class 3 and 9 2.6 0.9 2.6 0.9 0

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet J9D5? A Performance Solution must meet the Performance Requirements it satisfies: J1P1, J1P2, J1P3, J1P4. Start a Performance Solution →