WA B1D3 Determination of individual actions
Part B1 Structural provisions · varies B1D3 Determination of individual actions
Delete clause B1D3 and insert WA B1D3 as follows:
The magnitude of individual actions must be determined in accordance with the following:
Permanent actions:
the design or known dimensions of the building or structure; and
the unit weight of the construction; and
AS/NZS 1170.1; and
for a Class 7b building, a notional additional permanent roof load of not less than 0.15 kPa to support the addition of solar photovoltaic panels.
Imposed actions:
the known loads that will be imposed during the occupation or use of the building or structure; and
construction activity actions; and
AS/NZS 1170.1.
Wind, snow and ice and earthquake actions:
the applicable annual probability of design event for safety, determined by—
assigning the building or structure an Importance Level in accordance with Table B1D3a; and
determining the corresponding annual probability of exceedance in accordance with WA Table B1D3b; and
AS/NZS 1170.2, except where varied by WA Part B2; and
AS/NZS 1170.3 as appropriate; and
AS 1170.4; and
in cyclonic areas, metal roof cladding, its connections and immediate supporting members must comply with Specification 4; and
for the purposes of (v), cyclonic areas are those determined as being located in wind regions B2, C and D in accordance with AS/NZS 1170.2, except where varied by WA Part B2.
Actions not covered in (a), (b) and (c) above:
the nature of the action; and
the nature of the building or structure; and
the Importance Level of the building or structure determined in accordance with Table B1D3a; and
AS/NZS 1170.1.
For the purposes of (d) the actions include but are not limited to—
liquid pressure action; and
ground water action; and
rainwater action (including ponding action); and
earth pressure action; and
differential movement; and
time dependent effects (including creep and shrinkage); and
thermal effects; and
ground movement caused by—
swelling, shrinkage or freezing of the subsoil; and
landslip or subsidence; and
siteworks associated with the building or structure; and
construction activity actions.
Table B1D3a Importance Levels of buildings and structures
Importance level
Building Types
1
Buildings or structures presenting a low degree of hazard to life and other property in the case of failure.
2
Buildings or structures not included in Importance Level 1, 3 and 4.
3
Buildings or structures that are designed to contain a large number of people.
4
Buildings or structures that are essential to post-disaster recovery or associated with hazardous facilities.
Insert WA table (B1D3b) B1D3 as follows:
WA Table B1D3b: Design events for safety
Importance Level
Annual probability of exceedance for non-cyclonic wind
Annual probability of exceedance for cyclonic wind other than Wind Region D north of the Tropic of Capricorn
Annual probability of exceedance for cyclonic wind in Wind Region D north of the Tropic of Capricorn
Annual probability of exceedance for snow
Annual probability of exceedance for earthquake
1
1:100
1:200
1:250
1:100
1:250
2
1:500
1:500
1:1000
1:150
1:500
3
1:1000
1:1000
1:2000
1:200
1:1000
4
1:2000
1:2000
1:5000
1:250
1:1500
Notes
B1D3(a)(iv) does not take effect until 1 October 2023.
Exemptions
B1D3(a)(iv) does not apply to a Class 7b building—
where 100% of the roof area is shaded for more than 70% of daylight hours; or
with a roof area of not more than 55m2; or
where more than 50% of the roof area is used as a terrace, carpark, roof garden, roof light or the like.