Western Australia variation · NCC 2022 Volume One

WA B1D3 Determination of individual actions

Part B1 Structural provisions · varies B1D3 Determination of individual actions

Open on NCC Online ↗

Delete clause B1D3 and insert WA B1D3 as follows:

The magnitude of individual actions must be determined in accordance with the following:

Permanent actions:

the design or known dimensions of the building or structure; and

the unit weight of the construction; and

AS/NZS 1170.1; and

for a Class 7b building, a notional additional permanent roof load of not less than 0.15 kPa to support the addition of solar photovoltaic panels.

Imposed actions:

the known loads that will be imposed during the occupation or use of the building or structure; and

construction activity actions; and

AS/NZS 1170.1.

Wind, snow and ice and earthquake actions:

the applicable annual probability of design event for safety, determined by—

assigning the building or structure an Importance Level in accordance with Table B1D3a; and

determining the corresponding annual probability of exceedance in accordance with WA Table B1D3b; and

AS/NZS 1170.2, except where varied by WA Part B2; and

AS/NZS 1170.3 as appropriate; and

AS 1170.4; and

in cyclonic areas, metal roof cladding, its connections and immediate supporting members must comply with Specification 4; and

for the purposes of (v), cyclonic areas are those determined as being located in wind regions B2, C and D in accordance with AS/NZS 1170.2, except where varied by WA Part B2.

Actions not covered in (a), (b) and (c) above:

the nature of the action; and

the nature of the building or structure; and

the Importance Level of the building or structure determined in accordance with Table B1D3a; and

AS/NZS 1170.1.

For the purposes of (d) the actions include but are not limited to—

liquid pressure action; and

ground water action; and

rainwater action (including ponding action); and

earth pressure action; and

differential movement; and

time dependent effects (including creep and shrinkage); and

thermal effects; and

ground movement caused by—

swelling, shrinkage or freezing of the subsoil; and

landslip or subsidence; and

siteworks associated with the building or structure; and

construction activity actions.

Table B1D3a Importance Levels of buildings and structures

Importance level

Building Types

1

Buildings or structures presenting a low degree of hazard to life and other property in the case of failure.

2

Buildings or structures not included in Importance Level 1, 3 and 4.

3

Buildings or structures that are designed to contain a large number of people.

4

Buildings or structures that are essential to post-disaster recovery or associated with hazardous facilities.

Insert WA table (B1D3b) B1D3 as follows:

WA Table B1D3b: Design events for safety

Importance Level

Annual probability of exceedance for non-cyclonic wind

Annual probability of exceedance for cyclonic wind other than Wind Region D north of the Tropic of Capricorn

Annual probability of exceedance for cyclonic wind in Wind Region D north of the Tropic of Capricorn

Annual probability of exceedance for snow

Annual probability of exceedance for earthquake

1

1:100

1:200

1:250

1:100

1:250

2

1:500

1:500

1:1000

1:150

1:500

3

1:1000

1:1000

1:2000

1:200

1:1000

4

1:2000

1:2000

1:5000

1:250

1:1500

Notes

B1D3(a)(iv) does not take effect until 1 October 2023.

Exemptions

B1D3(a)(iv) does not apply to a Class 7b building—

where 100% of the roof area is shaded for more than 70% of daylight hours; or

with a roof area of not more than 55m2; or

where more than 50% of the roof area is used as a terrace, carpark, roof garden, roof light or the like.

Not in NCC 2025. No WA B1D3 in NCC 2025 Volume One.

The national clause