Deemed-to-Satisfy Provision · NCC 2022 Volume Three

B1D6 Top-up lines

Part B1 Cold water services · NCC 2019: B6.3

Open B1D6 on NCC Online ↗

A cold water service used to top up a rainwater tank must be in accordance with AS/NZS 3500.1.

Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three B1D6.

Defined terms used