Performance Requirement · NCC 2022 Volume Three

B1P6 Uncontrolled discharge

Part B1 Cold water services · NCC 2019: BP1.2

Open B1P6 on NCC Online ↗

A cold water service must avoid failure or uncontrolled discharge.

Changed in NCC 2025. See NCC 2025 Volume Three B1P6, or show what changed.

A The points of discharge for a cold water service must avoid failure — have — a working pressure of not less than 50 kPa; and a static pressure within the building of not more than 500 kPa; or uncontrolled discharge. have water pressures suitable for the correct functioning of the fixture or appliance where water pressures outside of (a)(i) and (a)(ii) are required.

Removed words are struck through; added words are highlighted. Comparison of the text only.