Deemed-to-Satisfy Provision · NCC 2022 Volume Three

B2D3 Layout of taps

Part B2 Heated water services · NCC 2019: B2.3

Open B2D3 on NCC Online ↗

Where both a heated water tap and a cold water tap are installed, the heated water tap must be installed to the left of, or above, the cold water tap if—

each tap controls a separate outlet; or

both taps control a combined flow of water delivered through a single outlet.

Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three B2D3.

Defined terms used