Deemed-to-Satisfy Provision · NCC 2025 Volume Three
B2D3 Layout of taps
Part B2 Heated water services · NCC 2019: B2.3
Where both a heated water tap and a cold water tap are installed, the heated water tap must be installed to the left of, or above, the cold water tap if—
each tap controls a separate outlet; or
both taps control a combined flow of water delivered through a single outlet.
Same wording in NCC 2022 Volume Three. See NCC 2022 Volume Three B2D3.