Deemed-to-Satisfy Provision · NCC 2022 Volume Three

B6D1 Deemed-to-Satisfy Provisions

Part B6 Rainwater services · NCC 2019: B6.1

Open B6D1 on NCC Online ↗
Varied in VIC. Check the variation for your state.

(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B6P1 to B6P6 are satisfied by complying with B6D2 to B6D6.

(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.

Changed in NCC 2025 (minor wording). See NCC 2025 Volume Three B6D1, or show what changed.

(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B6P1 to B6P6 B6P7 are satisfied by complying with B6D2 to B6D6. B6D7. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.

Removed words are struck through; added words are highlighted. Comparison of the text only.

State and territory variations all clauses side by side →