Deemed-to-Satisfy Provision · NCC 2025 Volume Three
B6D1 Deemed-to-Satisfy Provisions
Part B6 Rainwater services · NCC 2019: B6.1
Varied in VIC. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B6P1 to B6P7 are satisfied by complying with B6D2 to B6D7.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed since NCC 2022 (minor wording). See NCC 2022 Volume Three B6D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B6P1 to B6P6 B6P7 are satisfied by complying with B6D2 to B6D6. B6D7. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Removed words are struck through; added words are highlighted. Comparison of the text only.
State and territory variations all clauses side by side →
Clauses referred to
- B6P1 Pressure
- B6P7 Uncontrolled discharge
- B6D2 General requirements
- B6D7 Bushfire prone areas
- A2G2 Performance Solution
- A2G4 A combination of solutions