B7D1 Deemed-to-Satisfy Provisions
Part B7 Rainwater storage · NCC 2019: B6.1
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B7P1 and B7P4 are satisfied by complying with B7D2 and B7D3.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Notes
Changed in NCC 2025. See NCC 2025 Volume Three B7D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B7P1 and B7P4 B7P5 are satisfied by complying with B7D2 B7D3 and B7D3. B7D4. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) A2G2 (3) and A2G4(3) A2G4 (3) as applicable. Notes There are no Deemed-to-Satisfy Solutions for B7P2 and B7P3.
Removed words are struck through; added words are highlighted. Comparison of the text only.
State and territory variations all clauses side by side →
Clauses referred to
- B7P1 Contamination control
- B7P4 Identification
- B7D2 Collection of rainwater
- B7D3 Identification
- A2G2 Performance Solution
- A2G4 A combination of solutions
- B7P2 Uncontrolled discharge
- B7P3 Access and isolation