Verification Method · NCC 2022 Volume Three
C2V2 Pressure testing
Part C2 Sanitary drainage systems · NCC 2019: CV2.2
Varied in VIC. Check the variation for your state.
Compliance with C2P1 is achieved if the sanitary drainage system passes one or more of the pressure tests set out in Section 15 of AS/NZS 3500.2.
Changed in NCC 2025 (minor wording). See NCC 2025 Volume Three C2V2, or show what changed.
Compliance with C2P1 is achieved if the sanitary drainage system passes one or more of the pressure tests set out in Section 15 of AS/NZS 3500.2.
Removed words are struck through; added words are highlighted. Comparison of the text only.