Performance Requirement · NCC 2022 Volume Three
C3P4 Discharge to a Network Utility Operator sewer
Part C3 On-site wastewater management
Where an on-site wastewater management system discharges to the point of connection of a Network Utility Operator's sewer system, the connection must comply with the Network Utility Operator requirements.
Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three C3P4.