Performance Requirement · NCC 2025 Volume Three

C3P4 Discharge to a Network Utility Operator sewer

Part C3 On-site wastewater management

Open C3P4 on NCC Online ↗

Where an on-site wastewater management system discharges to the point of connection of a Network Utility Operator's sewer system, the connection must comply with the Network Utility Operator requirements.

Same wording in NCC 2022 Volume Three. See NCC 2022 Volume Three C3P4.

Defined terms used