H6V3 Verification of building envelope sealing
Part H6 Energy efficiency · NCC 2019: NSW V2.6.1, V2.6.2.3
(1) Compliance with H6P1 is verified for building envelope sealing when a building envelope is sealed at an air permeability of not more than 10 m3/hr.m2 at 50 Pa reference pressure when tested in accordance with AS/NZS ISO 9972 Method 1.
(2) Where an air permeability of not more than 5 m3/hr.m2 at 50 Pa reference pressure is achieved—
a mechanical ventilation system must be provided that—
can be manually overridden; and
provides outdoor air, either—
continuously; or
intermittently, where the system has controls that enable operation for not less than 25 percent of each 4 hour segment; and
provides a flow rate not less than that achieved with the following formula: [formula] , where—
[formula] = the required air flow rate (L/s); and
[formula] = the total floor area of the building (m²); and
[formula] = the number of bedrooms in the building; and
[formula] = the fraction of time within each 4 hour segment that the system is operational; and
any space with a solid-fuel burning combustion appliance must be ventilated with permanent openings directly to outside with a free area of not less than half of the cross-sectional area of the appliance’s flue; and
any space with a gas-fuelled combustion appliance must be ventilated in accordance with—
clause 6.4 of AS/NZS 5601.1; and
clause 6.4.5 of AS/NZS 5601.1.
(3) For the purposes of (2)(c), the volume of the space is considered to be 1 m3 for determining ventilation requirements.