New South Wales variation · NCC 2022 Volume Two

NSW H6V3 Verification of building envelope sealing

NSW Part H6 Energy efficiency · varies H6V3 Verification of building envelope sealing

Open on NCC Online ↗

(1) Compliance with NSW H6P2 is verified for building envelope sealing when a building envelope is sealed at an air permeability of not more than 10 m3/hr.m2 at 50 Pa reference pressure when tested in accordance with AS/NZS ISO 9972 Method 1.

(2) Where an air permeability of not more than 5 m3/hr.m2 at 50 Pa reference pressure is achieved—

a mechanical ventilation system must be provided that—

can be manually overridden; and

provides outdoor air, either—

continuously; or

intermittently, where the system has controls that enable operation for not less than 25 percent of each 4 hour segment; and

provides a flow rate not less than that achieved with the following formula: [formula] , where—

[formula] = the required air flow rate (L/s); and

[formula] = the total floor area of the building (m²); and

[formula] = the number of bedrooms in the building; and

[formula] = the fraction of time within each 4 hour segment that the system is operational; and

any space with a solid-fuel burning combustion appliance must be ventilated with permanent openings directly to outside with a free area of not less than half of the cross-sectional area of the appliance’s flue; and

any space with a gas-fuelled combustion appliance must be ventilated in accordance with—

clause 6.4 of AS/NZS 5601.1; and

clause 6.4.5 of AS/NZS 5601.1.

(3) For the purposes of (2)(c), the volume of the space is considered to be 1 m3 for determining ventilation requirements.

Not in NCC 2025. No NSW H6V3 in NCC 2025 Volume Two.