VIC H6D2 Application of Part H6
Part H6 Energy efficiency · varies H6D2 Application of Part H6
Delete clause H6D2 and insert VIC H6D2 as follows:
(1) Performance RequirementH6P1 for the thermal performance of the building is satisfied by—
complying with S42C2, using house energy rating software and S42C4(1); or
complying with the following parts of the ABCB Housing Provisions—
Part 13.2, for the building fabric; and
Part 13.3, for the external glazing and shading; and
Part 13.4, for building sealing; and
Part 13.5, for ceiling fans.
(2) Performance RequirementH6P2 for the energy usage of the building is satisfied by—
complying with S42C3 using house energy rating software and S42C4(2); or
complying with Parts 13.6 and 13.7 of the ABCB Housing Provisions for a building with a total floor area not greater than 500 m².
Notes: Victorian rainwater tank variation
The Victorian NCC 2019 rainwater tank variation (VIC V2.6.1 and V3.12.0 respectively) remains in effect until 30 September 2023 after which the following takes effect:
A rainwater tank must be installed in a Class 1 building in accordance with the regulations made under the Building Act 1993 (Victoria).
This Victorian rainwater tank requirement is now found in NCC 2022 Volume Three (Clauses VIC B6D2 and VIC B7D4).