NT 10.7.1 Sound insulation requirements
NT Part 10.7 Sound insulation · varies 10.7.1 Sound insulation requirements
Insert NT clause 10.7.1 in clause 10.7.1 as follows:
(1) A separating wall between two or more Class 1 buildings must—
achieve the weighted sound reduction index (RW) and impact sound resistance required by Table NT 10.7.1; and
be installed in accordance with the appropriate requirements of NT 10.7.2 and NT 10.7.3.
(2) For the purposes of this Part, the RW may be determined in accordance with AS ISO 717.1.
Insert NT table (10.7.1) 10.7.1 as follows:
NT Table 10.7.1: Required RW and sound impact levels for separating walls
Separating wall — location and penetrations
Impact sound resistance (as per Figures NT 10.7.1b to 10.7.1h)
RW (as per Figures NT 10.7.1i to 10.7.1u)
Type A: between a bathroom, sanitary compartment, laundry or kitchen and a habitable room (other than a kitchen) in an adjoining Class 1 building (dwelling) (see Figure NT 10.7.1a)
Yes
50
Type B: in all other cases to those listed as Type A (see Figure NT 10.7.1a)
No
45
A soil and waste pipe or other penetration that serves or passes through aseparating wallbetween houses — if the adjacent room is ahabitable room(other than a kitchen)
No
45
A soil and waste pipe or other penetration that serves or passes through aseparating wall— if the room is a kitchen or any other room
No
30
Insert NT figure (10.7.1a) 10.7.1 as follows:
NT Figure 10.7.1a: Required RW — plan view
Insert NT figure (10.7.1b) 10.7.1 as follows:
NT Figure 10.7.1b: Construction of walls to reduce impact sound and achieve a 50 RW: cavity brickwork
Figure Notes
2 leaves of 90 mm brick masonry with—
all joints filled solid with mortar; and
an air space not less than 40 mm between the leaves; and
the leaves connected by ties in accordance with AS 3700, except ‘(for piers—isolated and engaged)’ is removed from Clause 8.5.1(d) and where Clause 8.5.1 requires design for unreinforced masonry in accordance with Section 7, the member must also be designed as unreinforced masonry in accordance with Tables 10.3 and 4.1(a)(i)(C) of AS 3700; and
wall tie spacing as set out in Part 5.6.
Insert NT figure (10.7.1c) 10.7.1 as follows:
NT Figure 10.7.1c: Construction of walls to reduce impact sound and achieve a 50 RW: single leaf brickwork
Figure Notes
80 mm thick brick masonry with—
each face rendered 13 mm thick; and
50 mm x 12 mm thick timber battens at not more than 610 mm centres fixed to each face but not recessed into the render; and
one layer of 12 mm thick softboard nailed to the battens; and
6 mm thick medium density hardboard adhesive-fixed into the softboard.
Insert NT figure (10.7.1d) 10.7.1 as follows:
NT Figure 10.7.1d: Construction of walls to reduce impact sound and achieve a 50 RW: concrete blockwork
Figure Notes
190 mm thick concrete block masonry with—
each face of the blocks fitted with 50 mm x 50 mm timber battens, spaced at not more than 610 mm centres, screw-fixed into resilient plugs with rubber inserts; and
the space between the battens completely filled with mineral or glass wool blanket or batts not less than 50 mm thick; and
the outer face of the battens finished with plasterboard not less than 10 mm thick.
Insert NT figure (10.7.1e) 10.7.1 as follows:
NT Figure 10.7.1e: Construction of walls to reduce impact sound and achieve a 50 RW: timber-framed walling (method 1)
Figure Notes
70 mm x 45 mm F5 staggered timber studs at 600 mm centres both side on 120 mm x 35 mm F5 timber plates with—
one layer of 16 mm fire-protective grade plasterboard on both faces; and
50 mm glass fibre batts.
Insert NT figure (10.7.1f) 10.7.1 as follows:
NT Figure 10.7.1f: Construction of walls to reduce impact sound and achieve a 50 RW: timber-framed walling (method 2)
Figure Notes
70 mm x 45 mm F5 timber double studs at 450 mm - 600 mm centres with an air space not less than 20 mm between studs with two layers of 13 mm fire-protective grade plasterboard on both faces.
Insert NT figure (10.7.1g) 10.7.1 as follows:
NT Figure 10.7.1g: Construction of walls to reduce impact sound and achieve a 50 RW: steel stud walling (method 1)
Figure Notes
64 mm staggered metal studs (0.75 mm base metal thickness) at 600 mm centres both sides, clipped in 92 mm metal tracks with—
two layers of 13 mm fire-protective grade plasterboard to each side; and
50 mm glass wool cavity batts.
Insert NT figure (10.7.1h) 10.7.1 as follows:
NT Figure 10.7.1h: Construction of walls to reduce impact sound and achieve a 50 RW: steel stud walling (method 2)
Figure Notes
64 mm double metal studs (0.75 mm base meta thickness) at 600 mm centres with an air space not less than 20 mm between studs, in separate frames with no mechanical links, with—
two layers of 13 mm fire-protective grade plasterboard to each side; and
50 mm glass wool cavity batts.
Insert NT figure (10.7.1i) 10.7.1 as follows:
NT Figure 10.7.1i: Clay brickwork to achieve RW of 45 (method 1)
Figure Notes
Clay brickwork 110 mm thick in one or more leaves and with a mass per unit area of not less than 290 kg/m2.
Insert NT figure (10.7.1j) 10.7.1 as follows:
NT Figure 10.7.1j: Clay brickwork to achieve RW of 45 (method 2)
Figure Notes
Clay brickwork 80 mm thick, pressed brick and rendered 13 mm on one side, the mass per unit area of the unrendered wall being not less than 215 kg/m2.
Insert NT figure (10.7.1k) 10.7.1 as follows:
NT Figure 10.7.1k: Calcium silicate brickwork to achieve RW of 45 (method 1)
Figure Notes
Calcium silicate brickwork 90 mm thick with one layer of 10 mm fire-protective grade plasterboard on each side.
Insert NT figure (10.7.1l) 10.7.1 as follows:
NT Figure 10.7.1l: Calcium silicate brickwork to achieve RW of 45 (method 2)
Figure Notes
Calcium silicate brickwork 90 mm thick with one layer of 10 mm fire-protective grade plasterboard on metal furring channels.
Insert NT figure (10.7.1m) 10.7.1 as follows:
NT Figure 10.7.1m: Concrete blockwork to achieve RW of 45 (method 1)
Figure Notes
Concrete blockwork with—
190 mm solid units (or thicker); and
material density 2200 kg/m3.
Insert NT figure (10.7.1n) 10.7.1 as follows:
NT Figure 10.7.1n: Concrete blockwork to achieve RW of 45 (method 2)
Figure Notes
Concrete blockwork with—
110 mm solid units (or thicker); and
material density 2200 kg/m3; and
material thickness — 83 mm minimum; and
10 mm plasterboard or 12 mm render on each face.
Insert NT figure (10.7.1o) 10.7.1 as follows:
NT Figure 10.7.1o: Concrete wall to achieve RW of 45
Figure Notes
In-situ concrete — 125 mm thick with a density not less than 2200 kg/m3.
Insert NT figure (10.7.1p) 10.7.1 as follows:
NT Figure 10.7.1p: Steel stud walling to achieve RW of 45
Figure Notes
Steel stud walling with—
2 layers of 16 mm thick fire-protective grade plasterboard fixed to each face; or
2 layers of 13 mm thick plasterboard on both sides of 75 mm studs.
Insert NT figure (10.7.1q) 10.7.1 as follows:
NT Figure 10.7.1q: Timber stud walling to achieve RW of 49
Figure Notes
70 mmx 45 mm timber studs at 450 mm - 600 mm centres with—
one layer of 16 mm fire-protective grade plasterboard on one face; and
50 mm glass fibre batts; and
one layer of 16 mm fire-protective grade plasterboard on metal resilient channel.
Insert NT figure (10.7.1r) 10.7.1 as follows:
NT Figure 10.7.1r: Timber stud walling to achieve RW of 46
Figure Notes
Timber stud walling with 70 mm x 45 mm timber studs at 450 mm - 600 mm centres with two layers of 16 mm fire-protective grade plasterboard on both sides.
Insert NT figure (10.7.1s) 10.7.1 as follows:
NT Figure 10.7.1s: Ducts or other construction separating soil and waste pipes from units — masonry to achieve RW of 30
Figure Notes
Masonry not less than 90 mm thick.
Insert NT figure (10.7.1t) 10.7.1 as follows:
NT Figure 10.7.1t: Ducts or other construction separating soil and waste pipes from units — plasterboard to achieve RW of 30 (method 1)
Figure Notes
2 layers of plasterboard each 10 mm thick, fixed to timber studs not less than 75 mm x 50 mm and spaced at not more than 400 mm centres.
Insert NT figure (10.7.1u) 10.7.1 as follows:
NT Figure 10.7.1u: Ducts or other construc
Changed since NCC 2022. See ABCB Housing Provisions 2022 NT 10.7.1, or show what changed.
Insert NT clause 10.7.1 in clause 10.7.1 as follows: (1) A separating wall between two or more Class 1 … this Part, the RW may be determined in accordance with AS/NZS AS ISO 717.1. Insert NT table (10.7.1) 10.7.1 as follows: NT Table 10.7.1 10.7.1: Required RW and sound impact levels for separating walls Separating … waste pipe or other penetration that serves or passes through a separating wall between aseparating wallbetween houses — if the adjacent room is a habitable room (other ahabitable room(other than a kitchen) No 45 A soil and waste pipe or other penetration that serves or passes through a separating aseparating wall — if the room is a kitchen or any … (10.7.1u) 10.7.1 as follows: NT Figure 10.7.1u: Ducts or other construction separating soil and waste pipes from units — plasterboard to achieve RW of 30 (method construc
Removed words are struck through; added words are highlighted. Comparison of the text only.