Table · ABCB Housing Provisions 2025

Table 7.4.4b Overflow volume for dedicated measure (L/s)

Part 7.4 Gutters and downpipes

Open Table 7.4.4b on NCC Online ↗
Design 5 minute duration rainfall intensity (mm/h) (from Table 7.4.3d)Roof catchment area — 30 m2Roof catchment area — 40 m2Roof catchment area — 50 m2Roof catchment area — 60 m2Roof catchment area — 70 m2
150 mm/h1.3 L/s1.7 L/s2.1 L/s2.5 L/s2.9 L/s
175 mm/h1.5 L/s1.9 L/s2.4 L/s2.9 L/s3.4 L/s
200 mm/h1.7 L/s2.2 L/s2.8 L/s3.3 L/s3.9 L/s
225 mm/h1.9 L/s2.5 L/s3.1 L/s3.8 L/s4.4 L/s
250 mm/h2.1 L/s2.8 L/s3.5 L/s4.2 L/s4.9 L/s
275 mm/h2.3 L/s3.1 L/s3.8 L/s4.6 L/s5.3 L/s
300 mm/h2.5 L/s3.3 L/s4.2 L/s5.0 L/s5.8 L/s
325 mm/h2.7 L/s3.6 L/s4.5 L/s5.4 L/s6.3 L/s
350 mm/h2.9 L/s3.9 L/s4.9 L/s5.8 L/s6.8 L/s
365 mm/h3.1 L/s4.2 L/s5.2 L/s6.3 L/s7.3 L/s
400 mm/h3.3 L/s4.4 L/s5.6 L/s6.7 L/s7.8 L/s

Table for 7.4.4 Installation of gutters

Same wording in ABCB Housing Provisions 2022. See ABCB Housing Provisions 2022 Table 7.4.4b.