Performance Requirement · NCC 2025 Volume Three
B6P7 Uncontrolled discharge
The likelihood of failure of, or uncontrolled discharge from, a rainwater service must be avoided.
New in NCC 2025. No B6P7 in NCC 2022 Volume Three; it may have moved or been renumbered.