Performance Requirement · NCC 2025 Volume Three
C3P5 General requirements
Part C3 On-site wastewater management
Varied in TAS. Check the variation for your state.
On-site wastewater management systems that facilitate on-site storage, treatment, disposal or re-use of wastewater must be designed and constructed—
with required treatment and storage capacity for the volume and make up of waste and frequency of discharge for disposal; and
with required size, strength and rigidity for the nature, flow rates, volume of wastes and/or waste products which must be processed; and
using materials which are impervious both to the waste for which disposal is required and to water; and
to avoid the likelihood of surface water and stormwater entering the system.
Same wording in NCC 2022 Volume Three. See NCC 2022 Volume Three C3P5.