Performance Requirement · NCC 2025 Volume Three

C3P6 Land application systems

Part C3 On-site wastewater management

Open C3P6 on NCC Online ↗

(1) On-site wastewater management systems and associated land application systems must—

complete the treatment, uptake and absorption of the final effluent within the boundaries of the approved area; and

protect against internal contamination; and

provide ventilation to avoid the likelihood of foul air and gases from accumulating in the system.

(2) On-site wastewater management systems and associated land application systems must avoid the likelihood of—

the creation of unpleasant odours or the accumulation of offensive matter; and

stormwater run-off entering the system; and

root penetration or ingress of ground water entering the system; and

unintended or uncontrolled discharge; and

blockage and leakage; and

damage from superimposed loads or ground movement.

Changed since NCC 2022. See NCC 2022 Volume Three C3P6, or show what changed.

(1) On-site wastewater management systems and associated land application systems … On-site wastewater management systems and associated land application systems must — avoid the likelihood of — the creation of unpleasant odours or the accumulation of offensive matter; and avoid the likelihood of stormwater run-off entering the system; and avoid the likelihood of root penetration or ingress of ground water entering the system; and avoid the likelihood of unintended or uncontrolled discharge; and avoid the likelihood of blockage and leakage; and avoid the likelihood of damage from superimposed loads or ground movement.