C3P6 Land application systems
Part C3 On-site wastewater management
(1) On-site wastewater management systems and associated land application systems must—
complete the treatment, uptake and absorption of the final effluent within the boundaries of the approved area; and
protect against internal contamination; and
provide ventilation to avoid the likelihood of foul air and gases from accumulating in the system.
(2) On-site wastewater management systems and associated land application systems must—
avoid the likelihood of the creation of unpleasant odours or the accumulation of offensive matter; and
avoid the likelihood of stormwater run-off entering the system; and
avoid the likelihood of root penetration or ingress of ground water entering the system; and
avoid the likelihood of unintended or uncontrolled discharge; and
avoid the likelihood of blockage and leakage; and
avoid the likelihood of damage from superimposed loads or ground movement.
Changed in NCC 2025. See NCC 2025 Volume Three C3P6, or show what changed.
(1) On-site wastewater management systems and associated land application systems … On-site wastewater management systems and associated land application systems must — avoid the likelihood of — the creation of unpleasant odours or the accumulation of offensive matter; and avoid the likelihood of stormwater run-off entering the system; and avoid the likelihood of root penetration or ingress of ground water entering the system; and avoid the likelihood of unintended or uncontrolled discharge; and avoid the likelihood of blockage and leakage; and avoid the likelihood of damage from superimposed loads or ground movement.
Removed words are struck through; added words are highlighted. Comparison of the text only.