New South Wales variation · NCC 2025 Volume Three
NSW B2D9 General Requirement
NSW Part B2 Heated water services · varies B2D9 General requirements
Delete clause B2D9 and insert NSW B2D9 as follows:
A heated water service must be in accordance with AS/NZS 3500.4, with the following variations:
Insert clause 3.4 Tempering Valve
A tempering valve shall:
have unions or similar couplings on the inlets and outlets; and
be accessible for adjustment, maintenance or replacement.
New in NCC 2025. No NSW B2D9 in NCC 2022 Volume Three; it may have moved or been renumbered.