H2P1 Rainwater management
Part H2 Damp and weatherproofing · NCC 2019: P2.2.1
(1) Surface water, resulting from a storm having an annual exceedance probability of 5% and which is collected or concentrated by a building or sitework, must be disposed of in a way that avoids the likelihood of damage or nuisance to any other property.
(2) Surface water, resulting from a storm having an annual exceedance probability of 1% must not enter the building.
(3) A drainage system for the disposal of surface water resulting from a storm having an annual exceedance probability of—
5% must—
convey surface water to an appropriate outfall; and
avoid surface water damaging the building; and
1% must avoid the entry of surface water into a building.
Limitations
H2P1(2) does not apply to a Class 10 building except where its construction contributes to the weatherproofing of the Class 1 building.